Complete step-by-step guide to applying for the Solar ATAP programme. From initial consultation to TNB grid connection.
To apply for Solar ATAP: 1) Contact a SEDA-registered installer 2) Get site assessment & quotation 3) Installer submits application to SEDA 4) Receive approval (2-4 weeks) 5) Installation (1-3 days) 6) TNB inspection & grid connection. Total timeline: 4-8 weeks.
From first contact to generating your own clean energy
The first and most important step is finding a qualified installer registered with SEDA (Sustainable Energy Development Authority Malaysia). A registered installer ensures your system meets all regulatory requirements and handles all paperwork for you.
Sejahtera Gemilang Sdn Bhd provides complete end-to-end solar solutions. From site assessment to SEDA application to TNB connection - we manage everything so you don't have to. Just sit back and watch your electricity bills shrink.
Our team visits your property to conduct a thorough assessment:
Based on this assessment, we design a system perfectly sized for your needs and budget.
You'll receive a detailed, transparent quotation including:
Review carefully, ask any questions, then sign the agreement and pay the deposit (typically 30-50%).
We handle all the paperwork for you. Required documents include:
SEDA reviews your application and checks grid capacity in your area. Unlike NEM 3.0, Solar ATAP has no fixed quota, so approval is based on grid stability rather than limited slots.
You'll receive a Confirmation of Acceptance (COA) once approved.
With approval in hand, our certified team begins the installation:
We mount panels, install the inverter, and connect the electrical system. You pay the remaining balance upon completion.
The final step is TNB inspection. TNB will:
Contact us for a free consultation. We handle everything from A to Z - you just enjoy the savings.