How to Apply for Solar ATAP Malaysia

Complete step-by-step guide to applying for the Solar ATAP programme. From initial consultation to TNB grid connection.

Quick Answer: Solar ATAP Application Process

To apply for Solar ATAP: 1) Contact a SEDA-registered installer 2) Get site assessment & quotation 3) Installer submits application to SEDA 4) Receive approval (2-4 weeks) 5) Installation (1-3 days) 6) TNB inspection & grid connection. Total timeline: 4-8 weeks.

7 Steps to Solar Freedom

From first contact to generating your own clean energy

1
Getting Started

Contact a SEDA-Registered Installer

The first and most important step is finding a qualified installer registered with SEDA (Sustainable Energy Development Authority Malaysia). A registered installer ensures your system meets all regulatory requirements and handles all paperwork for you.

Trusted Partner

Let Us Handle Everything

Sejahtera Gemilang Sdn Bhd provides complete end-to-end solar solutions. From site assessment to SEDA application to TNB connection - we manage everything so you don't have to. Just sit back and watch your electricity bills shrink.

Free site assessment
Handle all paperwork
TNB coordination
Get Free Consultation
2
Assessment

Site Assessment & System Design

Our team visits your property to conduct a thorough assessment:

  • Roof space, condition, and orientation
  • Shading analysis from trees or buildings
  • Electrical panel capacity check
  • Your electricity consumption patterns

Based on this assessment, we design a system perfectly sized for your needs and budget.

3
Agreement

Quotation & Agreement

You'll receive a detailed, transparent quotation including:

  • System size (kW) and expected generation
  • Equipment brands and specifications
  • Total cost and flexible payment terms
  • Warranty coverage (panels, inverter, workmanship)

Review carefully, ask any questions, then sign the agreement and pay the deposit (typically 30-50%).

4
Paperwork

SEDA Application Submission

We handle all the paperwork for you. Required documents include:

  • Copy of recent TNB electricity bill
  • Copy of IC (identity card)
  • Property ownership proof or landlord consent
  • System design and single-line diagram
You don't need to visit SEDA. We manage the entire submission process for you.
5
Approval

SEDA Approval

SEDA reviews your application and checks grid capacity in your area. Unlike NEM 3.0, Solar ATAP has no fixed quota, so approval is based on grid stability rather than limited slots.

Timeline 2-4 weeks

You'll receive a Confirmation of Acceptance (COA) once approved.

6
Installation

Professional Installation

With approval in hand, our certified team begins the installation:

Residential (5-10kW) 1-2 days
Commercial (50kW+) 1-2 weeks

We mount panels, install the inverter, and connect the electrical system. You pay the remaining balance upon completion.

7
Final Step

TNB Inspection & Grid Connection

The final step is TNB inspection. TNB will:

  • Inspect the installation for safety compliance
  • Replace your meter with a bi-directional meter
  • Activate your Solar ATAP account
Congratulations! You're now generating your own clean energy and earning export credits!